Greetings all,
So I've got an existing cafe with a type I hood over the cooking equipment. The roof is a flat roof. Bear in mind this has been there for some years now. The building owner is also a roofing contractor. He addded on the appropriate structure etc for a pitched roof over the flat roof. Sure nuff, they come and add onto the existing exhaust duct by fabricating an aluminum duct to slide over the existing duct to penetrate the new, higher roof level. No permit for the duct work, no inspection. The existing portion of the duct would not pass the clearance requirements where it passes through the old existing roof but it's grandfathered as I see it. Now, the new duct could made to be ok except that 1 it's aluminum 2 not welded and did not pass a light test.
I really don't want to make them tear it out but, the new section of duct is clearly not to 09 IMC standards. I feel like I'm backed to the wall on this and should issue a stop work order and have them fully comply with the Code for the new section of exhaust duct.
Differing opinions?
As always, thanks for the input
BS
So I've got an existing cafe with a type I hood over the cooking equipment. The roof is a flat roof. Bear in mind this has been there for some years now. The building owner is also a roofing contractor. He addded on the appropriate structure etc for a pitched roof over the flat roof. Sure nuff, they come and add onto the existing exhaust duct by fabricating an aluminum duct to slide over the existing duct to penetrate the new, higher roof level. No permit for the duct work, no inspection. The existing portion of the duct would not pass the clearance requirements where it passes through the old existing roof but it's grandfathered as I see it. Now, the new duct could made to be ok except that 1 it's aluminum 2 not welded and did not pass a light test.
I really don't want to make them tear it out but, the new section of duct is clearly not to 09 IMC standards. I feel like I'm backed to the wall on this and should issue a stop work order and have them fully comply with the Code for the new section of exhaust duct.
Differing opinions?
As always, thanks for the input
BS