• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

outdoor covered equipment platform-construction type

lmspringwater

Registered User
Joined
Oct 25, 2018
Messages
1
Location
97229
Hi, all

I am currently working on a project, where the client wants to build a covered equipment platform attached to a existing type 1B building on second floor for loading/unloading and pass through. The structure is a two-story high outdoor space with covered canopy and partially enclosed sheet metal sidings on 3 sides. square footage wise it is about 1000 SF. My question is -- Since the existing building is type 1B construction, does this covered platform has to be treated as type 1B construction? (given the total metal siding area is over 25% of the structure's perimeter). Any inputs are highly appreciated!
 
Hello and welcome. I am very confident that within the next few hours and days you will get a lot of feedback on this subject.
Can I ask your involvement in this project so we have a better idea in what context this post is? We have code officials, inspectors, plan reviewers, architects, engineers and others in this forum that are always willing to help. Thank you!
 
Need to know what codes are used there and occupancy use, sprinklered, size and height of the existing building. The existing building plus the addition must meet the allowed sq. ft. and height for the construction type of the addition unless there is a fire rated wall between. It also could make the means of egress longer.
 
Devil is in the details on this one.....If it truly is an equipment platform, and not sheltering a use and really not part of the building, it might fly. Not part of the "primary frame"...Can you attach a drawing, picture, or sketch?

Support and access elements for a piece of equipment in a building would not have to meet 1B requirements, so outside is feasible if you can convince the AHJ
 
I hope my little modest advice would be helpful in any case. As far as I know, 1B construction is fire resistive non-combustible type of construction, which is commonly found in mid-rise office and the buildings of the group R. So, I guess that this kind of construction would be suitable for covering the platform. Have you contacted any specialists? I guess you need to consult with fiber engineering professional estate. My best friend did have a quite similar problem and applied there. And I must admit they are supported by top-trained field supervisors and technicians. I am sure you would be delighted with your choice.
 
I hope my little modest advice would be helpful in any case. As far as I know, 1B construction is fire resistive non-combustible type of construction, which is commonly found in mid-rise office and the buildings of the group R. So, I guess that this kind of construction would be suitable for covering the platform. Have you contacted any specialists? I guess you need to consult with fiber engineering professional estate. My best friend did have a quite similar problem and applied there. And I must admit they are supported by top-trained field supervisors and technicians. I am sure you would be delighted with your choice.

So are you a sales person or architect ?
 
It's not a promotion in any case. And what is your link connected with, can you raise the curtain?
 