Inspector 102
REGISTERED
Is there anything that I am missing that prohibits Sch 40 PVC being used for vent stacks in a hospital three stories or less in height. Owner thought it had to be hubless ductile based on what is currently there. We are still under the 1997 UPC, but would appreciate any comments based on newer codes. Advised that intumescent seals would be required if penetrating a fire assembly such as floor or wall.