Mr. Inspector
SAWHORSE
Has anyone questioned the amount of the project total cost and the 20% spent on accessibility on an existing building? It seems to me that they could put down any amount they want.
I have an architect that always adds grab bars in the toilet room for existing buildings and it always comes out to exactly 20% of the cost no matter what they are doing to the existing building. When I do the inspection, I can't tell if there were any grab bars there before of if they are new. I guess I could look up the cost of the grab bars if I can find the brand of them but have no idea of the labor cost. I don't think it is my job to figure out if the architect or owner is telling the truth about this. Along as he gives me a piece of paper with the cost of the project and what they are doing and spending for the 20% I think I am covered.
What do you think?
I have an architect that always adds grab bars in the toilet room for existing buildings and it always comes out to exactly 20% of the cost no matter what they are doing to the existing building. When I do the inspection, I can't tell if there were any grab bars there before of if they are new. I guess I could look up the cost of the grab bars if I can find the brand of them but have no idea of the labor cost. I don't think it is my job to figure out if the architect or owner is telling the truth about this. Along as he gives me a piece of paper with the cost of the project and what they are doing and spending for the 20% I think I am covered.
What do you think?