• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

Ridge Beam

mp25

REGISTERED
Joined
Jun 2, 2016
Messages
115
Location
Illinois
Hi guys,

Ridge board question
IRC 2012 - 802.3

2X12 rafters with a 12:12 pitch. This makes the face of the cut rafter almost 16", where the rafter meets the ridge board (not structural). What is the best way for a contractor to handle this situation. He would either have to use a 2x18 ridge board (i don't know if thats readily available?). Any other alternatives? or comments on the gusset plates that the code allows?
 
Does not have to be a single member,1x10 and a 1x8 would do it, the principal is to fully support the plumb cut, that's why rafters opposing on another merely need a gusset to maintain alignment of the cuts.
 
Thanks, this is really helpful and an easy solution. Having been mostly on the design side of things, i don't always know how to resolve these 'problems'
 
or maybe a rim board
Product

Depth Range
1 1̷8” TJ®-Rim Board 9.5″ to 16″
1 ¼” 1.3E TimberStrand® LSL 9.5″ to 24″
1 ½” 1.3E TimberStrand® LSL 9.5″ to 24″
 
Thanks, this is really helpful and an easy solution. Having been mostly on the design side of things, i don't always know how to resolve these 'problems'

Well, you've come to the right place!

Now that you can see the value, step up and help support the forum as a sawhorse!
 
when i built, we would drop the ridge board to the bottom of the rafter, that supported the rafter and made the gap at the top much better for the ridge vent. A ridge board is not required for rafters framed opposit of each other, it was much easier to build with one though
 
I would fail you for leaving that gap at the top. The plumb cut requires full support, although you can butt the rafters together and scab a piece of plywood on them. When I was building, we would either use an LVL or use a 2 x 12 with a ripped piece tacked on top. The LVL would work best for a 2 x 12 rafter with a 12 pitch though. The idea is that you do not want to put pressure on one point of the plumb cut and induce a crack.
 
Back
Top