chris kennedy
ADMIN
I am making sixteen 1½" penetrations in a 24" sea wall just above normal high tide level. I will be installing a 1" PVC in each. Is a hydraulic grout an acceptable means of patching around the conduit?
I'll get a couple pictures today.
Thanks
I'll get a couple pictures today.
Thanks