jar546
CBO
I have a pole building that was submitted as a SFR. The bottom was a large garage for the owner's toys and the 2nd floor was to be a SFR. The initial permit was for the frame and skin only as the owner was going to contract out finishing the interior. Zoning was approved as a SFR and a permit was issued for the frame and skin only with the knowledge that another permit would have to be pulled for the interior construction of the 2nd floor and fire separation between the garage below and the SFR. Still with me?
Anyway, I just did a framing and skin inspection and was just told by the contractor that he is being asked to bid the project to finish the 2nd floor SFR. He asked me if he needed 5/8" rock for the ceiling to separate the attic and I said no. He said, "Oh, I thought apartments had to be separated". I said what apartments. I was then told that the owner plans on dividing the 2nd floor in half and will be renting out one side and will have exercise equipment and whatever else he wants on the other side for him. Now the owner will not live there at all but will(wants to) occupy half of the 2nd floor and all of the garage for his vehicles AND rent out the other apartment.
I am bumping this to the zoning officer first but need to figure out where he stands with the I-codes. The building was built per IBC due to construction type but the original SFR was to comply with the IRC. Nothing has been submitted yet for completing the project so I want to nip this in the butt before they plan too far ahead.
Thoughts?
Anyway, I just did a framing and skin inspection and was just told by the contractor that he is being asked to bid the project to finish the 2nd floor SFR. He asked me if he needed 5/8" rock for the ceiling to separate the attic and I said no. He said, "Oh, I thought apartments had to be separated". I said what apartments. I was then told that the owner plans on dividing the 2nd floor in half and will be renting out one side and will have exercise equipment and whatever else he wants on the other side for him. Now the owner will not live there at all but will(wants to) occupy half of the 2nd floor and all of the garage for his vehicles AND rent out the other apartment.
I am bumping this to the zoning officer first but need to figure out where he stands with the I-codes. The building was built per IBC due to construction type but the original SFR was to comply with the IRC. Nothing has been submitted yet for completing the project so I want to nip this in the butt before they plan too far ahead.
Thoughts?