This is a very strange request, one I have never heard before.........thought I'd post it here.
The email was like this:
I have a customer who is considering buying a building that has a 2.5Kw solar array on the roof, this building happens to be next door to his existing business that is appx. 50,000 sq. feet, it is a manufacturing facility and is a pig it eats a lot of electricity. He wants to know if it is possible to pull a permit to pull power from the inverter in the building he is considering buying and feeding his existing business, this would entail trenching the parking lot and installling a couple conduits and feeder wires to feed the main switchgear. I am also going to call Edison and see if they approve, let me know your thoughts on this.
This question came from a respectable electrical contractor. First, a 2.5Kw PV system is smaller than most residential installations......don't see how this is going to help much with a manufacturing facility. Secondly, this is really close to feeding one building through another, isn't it? (rather than from another). The existing building already has a complete service.
So, where can I find code reasons to not permit this installation? OR Is this somehow permissable? I don't think so, but I will probably spend the next couple of days pouring through the Code to find reasons to deny or permit this suggested installation.
Wayne
The email was like this:
I have a customer who is considering buying a building that has a 2.5Kw solar array on the roof, this building happens to be next door to his existing business that is appx. 50,000 sq. feet, it is a manufacturing facility and is a pig it eats a lot of electricity. He wants to know if it is possible to pull a permit to pull power from the inverter in the building he is considering buying and feeding his existing business, this would entail trenching the parking lot and installling a couple conduits and feeder wires to feed the main switchgear. I am also going to call Edison and see if they approve, let me know your thoughts on this.
This question came from a respectable electrical contractor. First, a 2.5Kw PV system is smaller than most residential installations......don't see how this is going to help much with a manufacturing facility. Secondly, this is really close to feeding one building through another, isn't it? (rather than from another). The existing building already has a complete service.
So, where can I find code reasons to not permit this installation? OR Is this somehow permissable? I don't think so, but I will probably spend the next couple of days pouring through the Code to find reasons to deny or permit this suggested installation.
Wayne