ICE
Oh Well
when I told you to get all of the wood stakes out before the concrete gets too hard. The footing is 24" into soil and the 35 stakes are 6" into the dirt at the bottom of the footing. It's gonna be tough to get them out now. Or we could wait until the termites eat them. Well that's a bad idea so rent a jack hammer.
This is the same contractor that did this: http://www.inspectpa.com/forum/showthread.php?6666-An-average-day
He's going to bump his head a bunch of times.
This is the same contractor that did this: http://www.inspectpa.com/forum/showthread.php?6666-An-average-day
He's going to bump his head a bunch of times.
Last edited by a moderator: