RJJ
Co-Founder
Had an interesting one laid on me yesterday. A local electrical contractor fax me a review letter from another AHJ which his plan had been rejected.
The building is single family detached home. The review letter referenced the 2009 IRC and NFPA 72 chapter 11. The plan reviewer indicated that besides the requirements listed in the IRC that a smoke detector must be place ever 500sf. For the life of me, I can not find any such section. Your thoughts!?
The building is single family detached home. The review letter referenced the 2009 IRC and NFPA 72 chapter 11. The plan reviewer indicated that besides the requirements listed in the IRC that a smoke detector must be place ever 500sf. For the life of me, I can not find any such section. Your thoughts!?