Here you can see the drilled holes in the footing.......the dowels.......and the epoxy.
Here you can see the special inspectors report that the work has been completed. The special inspector had been gone from the site for an hour.
The contractor told me that the special inspector assured him that it was okay to not be there during the work.....and here's his report to prove it.
I'm probably not the inspector to treat that way.
Here you can see the special inspectors report that the work has been completed. The special inspector had been gone from the site for an hour.
The contractor told me that the special inspector assured him that it was okay to not be there during the work.....and here's his report to prove it.
I'm probably not the inspector to treat that way.