Jobsaver
Registered User
Oh yeah, and Peach, don't be jealous. You can still but you some the same way she bought hers!
It is only logical if you have engineering that shows it to be logical. Your opinion; my opinion don't matter.Architect1281 said:So the fix was make it be as many continuous pieces as it is supposed to be and discount the spliced piece to zeroa logical approach.
All this talk about bolts and shear transfer got me thinking (as opposed to just typing.)jar546 said:The engineered fix involved adding another layer on each side of the girder with the new layers having their ends land on the support posts then a specific bolt pattern to attach it all.
ajweaver said:I was taught all the shear is transferred through the required fastners of a built up beam/girder.A three ply we can verify both faces were nailed.
On a 4 ply or 5 ply we require bolting.