I have an apartment building where the 12' x 14' x 8'-4" high living rooms are scheduled to have a ceiling fan-rated junction box installed in the middle, for optional future fan installation. The contractor is saying that if a fan were to be installed in the future, another sprinkler head would need to be added to the fire sprinkler system.
1. Do you agree?
2. How would you handle this during plan check?
Our sprinkler system was bid as design-build, so if a plan checker would normally require design based on anticipated future installation of the ceilign fan, then I would not anticipate a change order for the design-build contractor.
1. Do you agree?
2. How would you handle this during plan check?
Our sprinkler system was bid as design-build, so if a plan checker would normally require design based on anticipated future installation of the ceilign fan, then I would not anticipate a change order for the design-build contractor.