Your premier resource for building code knowledge.
This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.
Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.
Ready to upgrade? Log in and upgrade now.
Mule,Mule said:Why are you wanting to use the IBC when you need to use the IRC?Are you in a state that requires you to use the IBC?
Mule,Mule said:Okay, I take it that you want to use the IBC instead of the IRC.Has Washington State adopted the IRC. If so, does it let AHJ's ammend the code "if" the ammendments are more stringent than the code adopted?
In order to use the IBC section over the IRC, it would take the AHJ ammending specific sections in order to use the IBC vs the IRC
You would have to ammend the State version of the code (if that is even allowed)
Is it because you are wanting a special inspector to inspect the shear walls?
Are you wanting the contractor to secure the panels closer than 4" oc?
I don't quite understand what you are trying to do here.
I look at this differently. By the time we get to inspections, the design has been reviewed and approved. Hopefully any deficiencies in the design have already been addressed. One objective of the special inspection is to verify that the construction conforms to the design. Who is better to do this than the engineer who designed it? Another advantage of having the engineer inspect the work, is that it gives him/her a chance to see some of the difficulties that can be encountered in the real world in trying to implement some details. The designer may in some instances decide to come up with details in the future that are easier to implement. Of course, there are some technical aspects of special inspection that most engineers would not be qualified to do. Inspection of welds comes to mind.peach said:I've never been a fan of the structural designer inspecting their own design..Maybe it's just me...
It is consistent in the IRCbut I find the use of 4 inch or less shear wall nailing inconsistent with the conventional light-frame construction provision in the IBC.
Washington uses IRC but irregular components and elements of the building will fall under IBC.Bootleg said:Mule,That’s what I want to know.
I'm in Washington State and want to know how we can use the 2006 IBC in SFR in place of the 2006 IRC?