Hello All,
.
I am a superintendent for a multifamily property. We just received notice days before our turnover that they requiring a test and balance for each individual unit. There are 77 units.
2018 IBC section 403.3.1.1 (and 403.3.1.5), that validation of your Mechanical Engineers design has been met in the field. Please provide a Test and Balance report for “each occupiable space” (In each occupiable space, the ventilation system shall be designed to deliver the required rate of outdoor airflow to the breathing zone.) prior to final approval of each space or buildings mechanical system
The above code statement is per the city. Is this a necessary standard, or is there something I can do to fight what they are requesting? Any feedback or information is greatly appreciated.
Thank You
.
I am a superintendent for a multifamily property. We just received notice days before our turnover that they requiring a test and balance for each individual unit. There are 77 units.
2018 IBC section 403.3.1.1 (and 403.3.1.5), that validation of your Mechanical Engineers design has been met in the field. Please provide a Test and Balance report for “each occupiable space” (In each occupiable space, the ventilation system shall be designed to deliver the required rate of outdoor airflow to the breathing zone.) prior to final approval of each space or buildings mechanical system
The above code statement is per the city. Is this a necessary standard, or is there something I can do to fight what they are requesting? Any feedback or information is greatly appreciated.
Thank You