Three times in a row this man has stood me up. It's an EL service upgrade. This is the note he left me today. Next time you are going, let me know ahead of time. I'd like a pail of tapioca pudding.

Your premier resource for building code knowledge.
This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.
Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.
Ready to upgrade? Log in and upgrade now.
Do you call before you go to each inspection?Jobsaver said:I ask the office to always try and get a cell phone number for the permit holder contact, and, building occupant. Calls prevent wasted trips, and, allow you to order pudding before checkout.
I only call when the contractor/homeowner is 15 minutes or more late. My jurisdiction is a very small city so I make 'on the dot' appointments. I assume that someone will be there unless informed otherwise.ICE said:Do you call before you go to each inspection?
I need access to the water heater to see if the cold and hot water pipes have been bonded together.pwood said:why do you need someone there for a panel changeout?
I thought all the water heaters in your jurisdiction where installed on the outside of the homesICE said:I need access to the water heater to see if the cold and hot water pipes have been bonded together.