I have a submittal for an office trailer to be set up while a new building is being built. It will be there for > 180 days so 3103 is out. I made some comments concerning accessibility, MOE, plumbing etc. The response is that the public will only be minimally on site, by appointment only and will be "escorted" by staff. They also propose that they will not be connected to a potable water source, restrooms will use tanked water, and sewage will be tanked as well, and they will provide a water cooler in the employee break room.
-I read IPC 602.1 to require the trailers (4 connected) to have connection to a potable water supply.
-I read IBC 1103.1 to require the public spaces (not the employee work-spaces) to be accessible-this is not a construction trailer, it is being used by the office personnel, not the contractors.
-I read IPC 701.2 to require connection to the public sewer, or if it is stretched an approved private sewage disposal system.
-I read IPC t403.1 to require at least one drinking fountain (Hi/lo per IBC 1109.5.1).
Any thoughts? Big reason I am asking, this is a city project!
-I read IPC 602.1 to require the trailers (4 connected) to have connection to a potable water supply.
-I read IBC 1103.1 to require the public spaces (not the employee work-spaces) to be accessible-this is not a construction trailer, it is being used by the office personnel, not the contractors.
-I read IPC 701.2 to require connection to the public sewer, or if it is stretched an approved private sewage disposal system.
-I read IPC t403.1 to require at least one drinking fountain (Hi/lo per IBC 1109.5.1).
Any thoughts? Big reason I am asking, this is a city project!