Is there anything in the code to allow experimental set-up of equipment under a temporary permit and then it's removal?
I have a plant that produces some Co2 and they want to reduce that CO2. There is experimental equipment to be installed and I was asked if a permit would be required. There's no GC involved and the equipment would be installed to see if it works and then it could be removed. I have seen bits an pieces of the proposed plans but nothing is stamped, no cost estimate provided and no MEP plans provided. There was no talk of third-party inspections.
Q. Is there something in the code that allows the Building Official to allow experimental construction?
Q. Have you issued permits for anything similar to this?
I have a plant that produces some Co2 and they want to reduce that CO2. There is experimental equipment to be installed and I was asked if a permit would be required. There's no GC involved and the equipment would be installed to see if it works and then it could be removed. I have seen bits an pieces of the proposed plans but nothing is stamped, no cost estimate provided and no MEP plans provided. There was no talk of third-party inspections.
Q. Is there something in the code that allows the Building Official to allow experimental construction?
Q. Have you issued permits for anything similar to this?