Papio Bldg Dept
REGISTERED
I am noticing a tendency to not include existing door hardware in construction documents for tenant finish/change of occupancy projects. In some cases they might reference a Specification or Project Manual that was never provided at submittal, but mostly it isn't even provided there either. How do you verify compliance for door operations (1008.1.3) if there isn't any information? Isn't that a basic means of egress design consideration? There is a lot of reluctance to provide the information too. I don't get it.
Sincerely,
frustrated with status quo.
Sincerely,
frustrated with status quo.