I have a metal building with rooms / spaces being partioned out in it. The
contractor has submitted plans showing the L.A.T. [ a typical suspended
ceiling ] grid installed throughout the building. Also, there is R-30 roll
insulation shown as "proposed to be installed".
Question #1: Is the thermal insulation permitted to be installed directly
on the top of the ceiling grid tiles? Seems like we have discussed this
issue before...
Question # 2: There is a 1 hr. fire rated Exit passgeway designed in
to the rooms / spaces [ w/ office spaces, 1 Restroom & 1 Breakroom ]
on either side of the Exit passageway. Thermal insulation is also
shown to be installed directly above the fire rated "drop ceiling".
I'm preety sure that I have never seen an approved, fire rated ceiling
assembly design that allows thermal insulation to be installed directly
onto the non-fire side. Does anyone know of a such a design,
or possibly an ES report, or other?
Thanks for your input!
* * *
I have a metal building with rooms / spaces being partioned out in it. The
contractor has submitted plans showing the L.A.T. [ a typical suspended
ceiling ] grid installed throughout the building. Also, there is R-30 roll
insulation shown as "proposed to be installed".
Question #1: Is the thermal insulation permitted to be installed directly
on the top of the ceiling grid tiles? Seems like we have discussed this
issue before...
Question # 2: There is a 1 hr. fire rated Exit passgeway designed in
to the rooms / spaces [ w/ office spaces, 1 Restroom & 1 Breakroom ]
on either side of the Exit passageway. Thermal insulation is also
shown to be installed directly above the fire rated "drop ceiling".
I'm preety sure that I have never seen an approved, fire rated ceiling
assembly design that allows thermal insulation to be installed directly
onto the non-fire side. Does anyone know of a such a design,
or possibly an ES report, or other?
Thanks for your input!

* * *