Wondering if others get any kind of detail from either the truss company, or a dp, on the transistion from truss roof to stickbuilt? It fairly common around here, on the more complicated roof system, for the truss company to not build a complete roof package; some small areas have to be stick built for infill.
I don't worry about this much when its a small area, and a short span, but occasionally, we'll get an entire roof slope stick built, and scabbed onto the trusses. I've never seen details from the truss company as to how these areas should be tied together, or how if the loads that land on the other trusses have been considered in the calculations.
I don't worry about this much when its a small area, and a short span, but occasionally, we'll get an entire roof slope stick built, and scabbed onto the trusses. I've never seen details from the truss company as to how these areas should be tied together, or how if the loads that land on the other trusses have been considered in the calculations.