This is a sewer replacement. They dug a tunnel under the diving board rather than remove it. The tunnel is about 10' long and no deeper than 4'. The second picture is where the tunnel stopped and you can see that the tunnel got smaller as it went along. The contractor explained that a man dug the tunnel; one 5 gallon bucket at a time. I asked the contractor if he thought that perhaps it was dangerous to send a man into the tunnel. He said "Sure, and that's why I tied a rope around his waist."
I asked him how he planned to put the dirt back in the tunnel. "Not a problem" says he "we'll use the bucket."
What would you do from there?
I asked him how he planned to put the dirt back in the tunnel. "Not a problem" says he "we'll use the bucket."
What would you do from there?