Hyrax4978
REGISTERED
I am looking at providing a small IIIB project and based on table 601 and 704.10/704.11 it appears as though an overhead door lintel would be required to be 2 hour rated. So if we have a 14' overhead door, the lintel at that opening would need to be 2 hour rated. While i guess i could opt for a type V construction, it got me wondering how most IIIB buildings would handle this. Not a huge fan of intumescent paint. precast?