RiceEng
Member
I am doing a code review for a local builder in WI. I have not done one of these in years. The building is un-insulated except for the ceiling. Do I have to do a COMcheck worksheet?
Check the firemen's beer refrigerator, perhaps if they sit it in the new space they will comply.\ said:1. Those with a peak design rate of energy usage less than 3.4 Btu/h • ft2 (10.7 W/m2) or 1.0 watt/ft2 (10.7 W/m2) of floor area for space conditioning purposes.