Hyrax4978
REGISTERED
When providing a building lists as UL in table 506.2, meeting the requirements of 601 for that specific construction type, do we need to meet the open perimeters specified in section 507. While i don't see tabular UL triggering 507 requirements it seems as though the open perimeter is still required based on the internet, but i don't see where that trigger is in the code.
Any thoughts?
Any thoughts?