I have an existing manufacturing / processing facility
that is upsizing their existing electrical service to a
400 amp. [ 480 volt ] size......The main distribution
panel will be a 400 amp. service, with some
sub-panels downstream......Also, an outdoor, pad
mounted transformer for the various motors onsite.
What issues do I need to be looking for? ...size &
number of the gec's, ...size & type of grounding
electrodes, ...clearances, ...proper labeling of
panels and panel directories, other?
Thanks for your input!
+ < + >
I have an existing manufacturing / processing facility
that is upsizing their existing electrical service to a
400 amp. [ 480 volt ] size......The main distribution
panel will be a 400 amp. service, with some
sub-panels downstream......Also, an outdoor, pad
mounted transformer for the various motors onsite.
What issues do I need to be looking for? ...size &
number of the gec's, ...size & type of grounding
electrodes, ...clearances, ...proper labeling of
panels and panel directories, other?
Thanks for your input!
+ < + >