DKnoch
REGISTERED
I am doing electrical, mechanical, plumbing, sprinkler, and all building inspections at a private school. The plans show air handler condensate discharging to a waste receptor by means of indirect waste. My issue/question is section 802.3 2015 IPC "waste receptors shall not be installed in plenums, crawl spaces, attics, interstitial spaces above ceilings and below floors." These drains are above the office ceiling, but on a mezzanine. To me I would classify that as interstitial space above a ceiling. If the drains back up, it will be a mess in the office ceiling. As stated above, the engineered drawings show it done this way. In my opinion, our plan review should have caught this, but my depts plan review doesn't get into anything aside from life safety (for the most part). I know that's not how it should be, so no point in debating that. Im just curious how others here would interpret and enforce this situation. Thanks