Your premier resource for building code knowledge.
This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.
Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.
Ready to upgrade? Log in and upgrade now.
YesIs the variety where the pieces are cast at a precaster and shipped to the site differently named than where the pieces are cast on site.and tilted up?
Is the variety where the pieces are cast at a precaster and shipped to the site differently named than where the pieces are cast on site.and tilted up?
Both "tilt up"?Based on the second photo from the top left, I took it to be the type of construction where the wall panels are cast on-site after the floor slab has been poured, then the walls are simply tilted up and dropped into position.
Both "tilt up"?
No tilt-up if on site and precast if trucked in from the factoryBoth "tilt up"?
It could be any construction type, really, depending on the specified fire resistance.Tilt-up. (or Type I/II given you indicated Type of Construction)
I know... was just being smart.It could be any construction type, really, depending on the specified fire resistance.
You could have a concrete building with metal interior stud partitions within the allowable height and area for a Type VB building without requiring it to be a Type I or II building.