bill1952
SAWHORSE
Is an accessory structure to a one family dwelling still an IRC building if using R301.1.3 Engineered design.
"Where a building of otherwise conventional construction contains structural elements exceeding the limits of Section R301 or otherwise not conforming to this code, these elements shall be designed in accordance with accepted engineering practice. The extent of such design need only demonstrate compliance of nonconventional elements with other applicable provisions and shall be compatible with the performance of the conventional framed system. Engineered design in accordance with the International Building Code is permitted for buildings and structures, and parts thereof, included in the scope of this code."
I thought yes except the company furnishing the post frame design, materials, and sealed drawings says you can't design post frame under IRC and wants to know what type of IBC building it is (S1 or S2? not U since its over 1000 sf).
"Where a building of otherwise conventional construction contains structural elements exceeding the limits of Section R301 or otherwise not conforming to this code, these elements shall be designed in accordance with accepted engineering practice. The extent of such design need only demonstrate compliance of nonconventional elements with other applicable provisions and shall be compatible with the performance of the conventional framed system. Engineered design in accordance with the International Building Code is permitted for buildings and structures, and parts thereof, included in the scope of this code."
I thought yes except the company furnishing the post frame design, materials, and sealed drawings says you can't design post frame under IRC and wants to know what type of IBC building it is (S1 or S2? not U since its over 1000 sf).