jar546
CBO
OK, so you are called out to inspect a new generator and you find this. The generator company swears the new generator is in the same location as the old and the issue with workspace was pre-existing. You then find out that they will be changing the breaker inside that box and you will eventually have to inspect it.
Do you mandate that the panel be moved?
Should the generator company have put moving the panel in their bid anyway?
Should the electrical contractor hired by the generator company have flagged this already?
Will you just let it go and inspect everything other than workspace requirements?

Do you mandate that the panel be moved?
Should the generator company have put moving the panel in their bid anyway?
Should the electrical contractor hired by the generator company have flagged this already?
Will you just let it go and inspect everything other than workspace requirements?