We are planning the renovation of a number of existing fire stations. The renovations very from minor interior changes to more major additions. Per current Ohio building code, fire stations are essential facilities and that all NEW stations are required to have a tornado shelter. The question is, at what point does a renovation of a existing facility trigger the addition of a shelter? My thinking is that a level 3 alteration of more than 50% would require a shelter but that level 1 and level 2 alterations would not?