Yes I want to keep the apartment. I went to the planning bd initially to see if I can move my business to this property before I purchased it.
After PD approval, I purchased it and before any renovation or occupying, I went back to the board of adjustments to ask permission to keep the existing apartment in place. Approved no problem
I was issued engineering, zoning and building permits which allows the existing apartment to remain and did not require sprinklers. I am 80% through construction with all necessary inspection approvals and the town changed their mind.
Because I went to the PD first, the town is claiming I changed the use to all commercial and now I am changing it back to mixed use and a change of use was triggered causing me to conform to different codes such as installing sprinklers.
So if the building was never changed there should be no change of use. In the BD of Adj resolution it states approval for an existing condtion.