When Mr. Contractor pulls a permit, what do u request from that dude?
1)Two sets of plans one to be left at the JOB SITE not in Juniors truck!
2)Permit to be displayed at job, where?
3)when to be displayed?
4)Do you require the permit to be protected like in a zip-lock bag or allow it to be displayed in the window?
5)Do you make inspection notes on the back side of the displayed permit?
Other comments
1)Two sets of plans one to be left at the JOB SITE not in Juniors truck!
2)Permit to be displayed at job, where?
3)when to be displayed?
4)Do you require the permit to be protected like in a zip-lock bag or allow it to be displayed in the window?
5)Do you make inspection notes on the back side of the displayed permit?
Other comments