ICE
Oh Well
The panel label states that the enclosure can be either top or bottom fed. It goes on to state that if the enclosure is top fed, the lugs from the bottom shall be relocated to the top. My question is this. If the enclosure is top fed are the service entrance conductors required to land at the top location that is provided for a top fed panel? Is bringing the conductors through the enclosure to the bottom a listing violation? The picture at the bottom is not all that unusual and that violation would not happen with a top fed panel.