Mr. Inspector
SAWHORSE
a existing roof top unit was already within 10' of roof edge and it is being replaced do they have to put a guard up? IMC 304.10
Your premier resource for building code knowledge.
This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.
Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.
Ready to upgrade? Log in and upgrade now.
Sorry for that......I guess "You pass it!" is not an option?Rick18071 said:2009 IBC. the BCO (my boss) told me to pass it.
Is he willing to put his initials on the approval?Rick18071 said:2009 IBC. the BCO (my boss) told me to pass it.
Good point but I think requiring the gaurds during a unit replacement can justified through the current code lanquage.You don't want to require something that would be considered retro-fitting.