• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

An average day

I haven't gotten through to them with regards to bonding. They keep saying that bonding doesn't get any better than a Myers hub.

47681806001_e225d64d9c_b.jpg
 
Last edited:
If you go to the trouble of cutting a decent size hole in the slab, why not make the repair the right way? At least when they go back next week to replace it the concrete will still be green.
 
The original panel was repurposed as a J-box years ago. A surface mount service panel was placed next the original service cabinet. The hole has been there for all these years. It is still the method of choice in most of southern California. I do not approve such an installation but I see it done this way so often that I am convinced that it is approved in a lot of jurisdictions.

47681805671_163d4ab07b_b.jpg
 
Proof yet again that men will not be bothered with reading the installation instructions.

33804492648_b76679a6bd_b.jpg

32738919757_046ec5a9db_b.jpg

This was next door to the job that I was inspecting so I don't have to deliver the bad news. One day the wife will lament, "Ya know' that thing doesn't seem to be worth what you paid for it".
 
Last edited:
When I mentioned this to the superintendent I said that I know people that have been impaled. He said that he has witnessed it in person.

32748483897_d09ec0057f_b.jpg

This was later on that day:

32748484107_3bcb0bd0af_b.jpg
 
Last edited:
My local Costco. The bathrooms are being renovated. I've seen better stairs with carnival rides.

47717246731_645a294b24_b.jpg
 
Last edited:
Just another failed roof inspection!
IMG_20190429_094908[1].jpg
 

Attachments

  • IMG_20190429_094619[1].jpg
    IMG_20190429_094619[1].jpg
    3.1 MB · Views: 39
  • IMG_20190429_094729[1].jpg
    IMG_20190429_094729[1].jpg
    4.6 MB · Views: 39
  • IMG_20190429_094806[1].jpg
    IMG_20190429_094806[1].jpg
    618.3 KB · Views: 34
  • IMG_20190429_094941[1].jpg
    IMG_20190429_094941[1].jpg
    1.1 MB · Views: 37
  • Like
Reactions: ICE
The job is creating a bathroom between two second floor bedrooms. Back to back closets have been eliminated to provide the space for the bathroom.
46946808154_6bcc46ffb9_b.jpg

The first inspection was for the plumbing.

47683163542_6a73e6033e_b.jpg

40769606723_a8c008369d_b.jpg

Not long into it I noticed that the joist under the missing wall is 5-- 2"x10"s. I couldn't help but wonder why. The contractor was no help......until I asked him to remove an area of drywall from the lid. That's where I found this:

47683164192_e08a365346_b.jpg
 
Last edited:
So is that multiple layers of composition shingles over wood shakes?

Some of the roof was removed in some places. The Valley between the 2 roofs has wood shingle under it. One of the roofs still had 2 layers under it, think one 3 tab, one composite.

Whats with the foam?

Good question, was worried someone might be eating it with the fork laying there. :confused: no drip edge installed there either
 
Back
Top