jar546
Forum Coordinator
This is an A-2 being converted to a B. 4,000 square feet of office space with all brand new plumbing.
I cropped the bottom out to protect the innocent.
This is the 1 and only Plumbing page that was drawn by a DP and sealed by an engineer.
I don't think it cuts the mustard and already sent back my list to the DP.
What would you call out on plan review?
Lots of this could be field verified but I prefer more detail. How would you handle this?
Right click to open in another window.
http://inspectpa.com/download/PlumbingSubmittal.pdf
I cropped the bottom out to protect the innocent.
This is the 1 and only Plumbing page that was drawn by a DP and sealed by an engineer.
I don't think it cuts the mustard and already sent back my list to the DP.
What would you call out on plan review?
Lots of this could be field verified but I prefer more detail. How would you handle this?
Right click to open in another window.
http://inspectpa.com/download/PlumbingSubmittal.pdf