""""There is a maintenance hatch between floors which are a fire rated assembly. The hatch is in the normally open position for routine maintenance and will close via a fusible link.
The architect specified this fusible link.
http://globetechnologies.com/catalog...products_id=84
Is this link acceptable? """"""""
if an architect is invovled I kind of take it as new construction, so is a fusable link door allowed in new construction????????
The architect specified this fusible link.
http://globetechnologies.com/catalog...products_id=84
Is this link acceptable? """"""""
if an architect is invovled I kind of take it as new construction, so is a fusable link door allowed in new construction????????