north star
Sawhorse
- Joined
- Oct 19, 2009
- Messages
- 4,596
( * * * * )
We have some facilities with Commercial Generators.
We want to have some Load Tests performed on them to ensure
that they will actually start and carry the intended electrical loads.
What all should we be expecting for a complete and thorough
Load Test [ i.e. - length of time, ...ensuring all components all
are functioning from the generator to the actual bldg. electrical
systems, ...any applicable warranty of the Load Test, other ] ?
Thank you for your input !
( * * * * )
We have some facilities with Commercial Generators.
We want to have some Load Tests performed on them to ensure
that they will actually start and carry the intended electrical loads.
What all should we be expecting for a complete and thorough
Load Test [ i.e. - length of time, ...ensuring all components all
are functioning from the generator to the actual bldg. electrical
systems, ...any applicable warranty of the Load Test, other ] ?
Thank you for your input !
( * * * * )