I'm digging a 25 foot trench to install an electric car charger. I'm working with an electrician who already has a permit for the electrical portion of the job, but he pretty sure that there needs to be a separate building permit to dig the trench. I have a ticket from when I had the utilities marked, but he seems to think I need something in addition to that. Does anyone know if that's the case?