darcar
Silver Member
- Joined
- Nov 12, 2009
- Messages
- 129
Attached is a portion of a plan submitted. The drinking fountain is between 2 bathrooms and projects >4".ICC/ANSI A117.1-2003 Section 307.1, Protruding Objects reads "protruding objects on CIRCULAR PATHS shall comply with section 307". The IBC defines circular path as "An exterior or intwerior way of passage from one place to another for pedestrians". Our plan reviewer does not see this area as part of the circulation path, thus allowing the drinking fountain to protrude as it does.What are your opinions of this?I think it IS part of the path and the fountains should be sunk into the wall or walls built around them.
View attachment 1448
View attachment 1448
/monthly_2010_11/572953df7b818_drinkingfountain.jpg.cc443c0d2f0ab010eceaf97ca1bdabdc.jpg
View attachment 1448
View attachment 1448
/monthly_2010_11/572953df7b818_drinkingfountain.jpg.cc443c0d2f0ab010eceaf97ca1bdabdc.jpg