Robert
REGISTERED
If the joist are 16" OC then you can use IBC chapter 7 other wise it is not hard to find one hour floor ceiling assemblies
Remember the fireside is the ceiling and 2 layers of type X or C is all most assemblies use
The fireside for supporting construction in the conversion of the garage is the interior side so again it will be a simple single or double layer to achieve this unless CA have amended the IRC
If the fireside is ceiling only, why do many floor/clg. assemblies require a double wood floor or concrete topping? Would that be for acoustic control?