Sifu
SAWHORSE
- Joined
- Sep 3, 2011
- Messages
- 3,316
If a house and garage were attached only by an open covered breezeway would you require the steel/solid wood/20 min. door typically required for separation? I am thinking of 1/2" vertical drywall separation from roof to plate on the wall to protect from flame spread across the framed breezeway and if I went that way I can't see how I could justify the 9 lite door they have on the plan. But if someone wiser than me shows me a better way......