MikeC
REGISTERED
I recently ran into this during a final inspection at a restaurant. The plumber wasn't aware of the need for indirect waste (2009 IPC). I am trying to be as reasonable as possible, but I just don't see an easy fix for this one short of cutting up some concrete. Does anyone have any ideas on how to make this compliant with an easier fix?
https://drive.google.com/file/d/12eRmrzHKW7b49BBBlwCYyCvqkZPE-grb/view?usp=sharing
https://drive.google.com/file/d/12eRmrzHKW7b49BBBlwCYyCvqkZPE-grb/view?usp=sharing