REGISTERED
I don't like the idea of through face attaching a ledger with hangers for floor assemblies to the face of sheetrock.
For 1 hour rated walls my latest understanding is that I would need to attach through the sheetrock (1 layer) and for 2 hours would need to attach directly to the the face of 2 layers of gyp into the studs.
Is there any way of getting around these connection details? is this really how it would be done to meet code.