Sifu
SAWHORSE
- Joined
- Sep 3, 2011
- Messages
- 3,056
Is there any justification for classifying a manufacturing plant for lithium ion energy systems (battery systems) as an F-1, and not an H? They list the battery charging room as an H-3, but not the manufacturing areas.
I am asking for a HM report. They list the H-3, as existing, and it took a minute before I even realized that this was a change to a whole new MFR process for new materials. Seems a little suspect, I thought it was just a minor remodel of an existing plant with the same process but I went looking for how this was previously approved and realized my assumption was wrong. The plans sure present it as a minor remodel, not this change.
I am asking for a HM report. They list the H-3, as existing, and it took a minute before I even realized that this was a change to a whole new MFR process for new materials. Seems a little suspect, I thought it was just a minor remodel of an existing plant with the same process but I went looking for how this was previously approved and realized my assumption was wrong. The plans sure present it as a minor remodel, not this change.
Last edited: