Existing daycare with no building changes would like their maximum occupancy increased. All classes exit to grade from classrooms, it looks like the maximum can be increased to 99 and still stay with a group-E. Do most of you do a letter or actually change the certificate of occupancy. Remember I'm not changing group classification so I don't think I would need to re-issue the CO that another inspector issued when the building was originally approved.
I think I can do this with a letter?
I think I can do this with a letter?