BSSTG
Gold Member
Greetings all,
Sorry no pic. Existing 200 amp meter can. Load side of the meter conductors leave the meter and are terminated into a service disconnect breaker immediately adjacent to the meter. Load side of the breaker feeds back into the meter can and exits the meter can through the rear to a panel. Both line side and load side conductors are fed through a close nipple. Now this has been in service for better than 20 years. I would not have passed it like that when it was built but that was before my time here. After all of these years the local power company rep will not allow a reconnect as the power has been off recently to his bldg. I'm not even sure it's a code violation except for the can is used as a raceway. And even with that there's enough room and bending space in the can.
What say you folks? I think it's chicken stools.
BSSTG
Sorry no pic. Existing 200 amp meter can. Load side of the meter conductors leave the meter and are terminated into a service disconnect breaker immediately adjacent to the meter. Load side of the breaker feeds back into the meter can and exits the meter can through the rear to a panel. Both line side and load side conductors are fed through a close nipple. Now this has been in service for better than 20 years. I would not have passed it like that when it was built but that was before my time here. After all of these years the local power company rep will not allow a reconnect as the power has been off recently to his bldg. I'm not even sure it's a code violation except for the can is used as a raceway. And even with that there's enough room and bending space in the can.
What say you folks? I think it's chicken stools.
BSSTG