Tim Cannon
Member
I am sure this has been adressed, but I can not find it. In a commercial building is a pull handle with a thumbpiece acceptable on the other side of a panic? Something tells me no since it would require tight grasping and pinching. It was specd by the architect, but I was going to submitt a lever handle in it's place. Thoughts or code #'s...