What was there before and what are they doing?
So ... much more than maintenance. Busted! Red tag the stairs as unsafe to use until proper permit is pulled.There was an oval landing and they cut the stairs, replaced the bottom 4 risers and added the flair and replaced the railings to match the flair.
Doesn't really matter now. Looks all new to me.What was there before and what are they doing?
Can you explain enforcement vs compliance.Our office is not of the code enforcement mentality but we are of the code compliance mentality.
When you say that they "cut the stairs".....did the stringers get cut? Have you formed an opinion of the work? If you required a permit, would you require an engineered plan?
The base plate for the newel post looks too small.
The stringers were cut off at the point you see and replaced with some sort of a splice method yet to be seen.If they did not modify the stringers then I would just amend the kitchen remodel permit to include the stair work with a description and photos of what they have done and move on. Our office is not of the code enforcement mentality but we are of the code compliance mentality.
The stringers were cut off at the point you see and replaced with some sort of a splice method yet to be seen.
Enforcement is when a department uses the code in an authority type way of follow the rules or this is what we will do to make you follow the rules.
Compliance is when a department works and educates the customer about the code and the problem and how to correct it in a manner that meets the code or intent of the code and the customer willingly agrees to make the corrections.
Sometimes compliance will not work and enforcement procedures will then be needed but it should be the last resort
Im thinking he gave a good answer. One thing that is frequently mentioned here ... call the local BI and ask before doing something you are unsure of. I suspect most inspector-types would rather explain what is required, than be the bad guy after the fact.So every time you guys fail an inspection you provide education on how to fix it?
How often do they ask for a fix? It depends on the problem at hand. I try to avoid providing a fix. I give them one and they screw that up....then I hear, “We did exactly what you told us to do.” What about cases where there’s several acceptable fixes.....do I have to provide them all? If I don’t I hear, “Why didn’t you tell us about the other fixes?”So every time you guys fail an inspection you provide education on how to fix it?
So how do they prescriptively build stringers?![]()